• head_banner

STE Design Capability

qksj
摄图网_600236537_工业电力管道方案设计(非企业商用)
sj

Applicable Software List

No. ltem Description
1 Auto CAD 2Dand 3D
2 Auto CAD Plant 3D P&ID P&ID
3 Auto CAD Plant 3D 3D, layout and lsO drawing
4 Autodesk Inventor 3D for Equipment
5 Soildworks 3D for Equipment
6 Tekla
Detail design for steel structure
7 PKPM/Midas Gen/STAAD.Pro
Stress analysis for steel structure
8 TIA portal V14 Programming for control system
9 Wincc flexible 2008 Programming for touch screen
10 SW6 Strength calculation for process equipment
11 PV Elite Pressure vessel design
12 CAESARII Pipeline stress analysis
tu1

STE Project Reference

Client A world-leading supplier of machinery and process
technology in the energy and food sectors
Description Mangrove Lithium Project
Duration June.2025-Jan.2026
STE Scope 6 Detail design as per P&ID. +Manufacture
1
Client World-renowned water and wastewater treatment enterprises
Description Container skids
Duration Aug.2025-Jan..2026
STE Scope Develop the DWG drawings
2
Client VISIONBLUE 200T project storage bin + processing bin
Description 200T project storage bin + processing bin
Duration Oct.2024-Apr.2025
Work Scope Detail design as per P&ID;Manual Valves supply;
Fabrication and assembly.
01
Client Domestic famous power cable
Description Combustion valve manifold
Duration Sep.2024-Mar.2025
Work Scope Detail design as per P&ID. +Manufacture
02
Client A supplier of energy equipment and solutions for the real estate industry
Description Heat pump skids
Duration Aug.2024-Nov.2025
Work Scope Detail design as per P&ID. +Manufacture
03
Client International famous chemical company
Description Purification device membrane skid
Duration Aug.2024-Feb.2025
Work Scope Detail design as per P&ID. +Manufacture
04
Client Domestic famous electrical engineering research institute
Description Solid-state hydrogen storage skid/Cold water heat transfer skid
Duration Aug.2024~Dec.2024
Work Scope Detail design as per P&ID.
05
Client One of the largest specialist fire companies in Europe
Description Deluge valve skid
Duration Apr.2024-May.2024
Work Scope Equipment develop the DWG drawings
06
Client Taiwan's famous chemical enterprise
Description Taiwan hydrogen compressor
Duration Apr.2024-Nov.2024
Work Scope Detail design as per P&ID. +Manufacture
07
Client Domestic famous new energy company
Description Hydrogen filling cabinet skid / Hydrogen cabinet skid
Duration Mar.2024-Aug.2024
Work Scope Detail design as per P&ID. +Manufacture
08
Client Domestic famous new energy company
Description hydrogen combiner discharge
Duration Feb.2024-Mar.2024
Work Scope Equipment develop the DWG drawings
09
Client Local Industrial Gas Supplier
Description Hydrogen filling cabinet skid / Hydrogen cabinet skid
Duration Jan.2024~Aug.2024
Work Scope Detail design as per P&ID.
10
Client
Well-known Institute in Aerospace Industry
Description
Qil Remove System for Cold Box
Duration
Aug. 2020~Apr. 2021
STE Scope
Detail design as per P&ID; Valves supply;
Fabrication and assembly.
a
Client
World Leading Industrial Gas Supplier
Description
Cold Box
Duration
Feb. 2020~Jul. 2020
STE Scope
Detail design as per P&ID; Valves supply;
Fabrication and assembly.
b
Client
Local Industrial Gas Supplier
Description
Nitrogen generator Warm Skid
Duration
May. 2021~Aug. 2021
STE Scope
Detail design per P&ID; Fabrication and assembly.
c
Client
Well-known Chinese Industrial Gas Supplier
Description
Nitrogen generator Warm Skid
Duration
Jun. 2021~Oct. 2021
STE Scope
Detail design as per P&ID; Manual Valves supply;Fabrication and assembly.
d
Client
Well-known EPC Contractor
Description
Chemical Injection Package (11 sets)
Duration
Mar. 2018~Dec. 2018
STE Scope
Detail design as per P&ID; Main equipments(Pumps/Valves/Agitator,etc) and Instrumentation supply;Vessels fabrication(in compliance with ASME U);Assembly.
e
Client
UK Based Sustainable Energy Solutions Company
Description
Engineering Sevice for Moduel
Duration
Oct. 2022~present
STE Scope
Detail Design per P&ID
f
Client
World Leader in High Technologies for the Gas Field
Description
Pretreatment Skid;MP Dring & Qil Removal Skid;Membranes Skid
Duration
Dec. 2020~May. 2021/ Jan. 2022~Aug. 2022Jun. 2022~Feb. 2023
STE Scope
Detail design per P&ID; Manual Valves supply;Fabrication and assembly.